## Preparing Your Site for Cabin Delivery
Proper site preparation is crucial for successful cabin installation. Here's what to expect and how to prepare.
### Phase 1: Site Assessment
**What We Evaluate**:
- Terrain and slope analysis
- Soil conditions and bearing capacity
- Drainage patterns and water table
- Sun exposure and views
- Access route for delivery
- Utility connection points
- Setback requirements
- Environmental considerations
**Site Visit Process**:
1. Initial phone/video consultation
2. On-site assessment by Avanta team
3. Survey and measurements
4. Soil testing if required
5. Written site report and recommendations
### Phase 2: Clearing and Access
**Clearing Requirements**:
- Clear area: Cabin footprint + 10 feet all sides
- Remove trees, stumps, and debris
- Preserve trees for privacy/windbreak where possible
- Dispose of debris properly (burning permits if applicable)
**Access Route Needs**:
- Minimum width: 14 feet clear
- Overhead clearance: 14 feet minimum
- Maximum grade: 15% (varies by delivery method)
- Firm surface or temporary road
- Turning radius at delivery point: 60+ feet
**Access Challenges and Solutions**:
- Narrow driveways: Temporary widening or alternative routes
- Low branches: Trimming or removal
- Soft ground: Temporary gravel/matting
- Steep grades: Specialized equipment (crane delivery)
### Phase 3: Grading and Drainage
**Grading Objectives**:
- Level building pad (within 2" over cabin footprint)
- Positive drainage away from cabin
- Manage surface water runoff
- Prepare for foundation installation
**Typical Grading Work**:
- Cut and fill to achieve level pad
- Install drainage swales if needed
- Compact subgrade soil
- Place gravel base (typically 4-6" compacted)
**Drainage Solutions**:
- French drains for high water table
- Perimeter drains around foundation
- Rain gardens for surface water
- Proper grading slope (minimum 5% away from building)
### Phase 4: Utility Preparation
**Electrical**:
- Service upgrade may be required
- Underground or overhead routing
- Panel location and meter base
- Temporary power for construction
**Typical Requirements**:
- 100-200 amp service for cabins
- Buried conduit from main panel
- Permit and inspection required
- Licensed electrician required
**Water**:
- Connection to municipal supply, or
- Well drilling and pump installation, or
- Alternative water system (cistern, rainwater)
**Municipal Water Connection**:
- Permit from local utility
- Main line tap or extension
- Meter installation
- Pressure considerations
**Sewer/Septic**:
- Connection to municipal sewer, or
- Septic system design and installation, or
- Alternative systems (composting, holding tank)
**Septic Process**:
1. Site evaluation by certified professional
2. Design based on soil and cabin size
3. Permit from health authority
4. Installation before cabin arrival
5. Final inspection
### Phase 5: Foundation Installation
**Timeline**: 1-3 weeks depending on type
**Helical Piles (Most Common)**:
- Equipment access required
- 1-2 days installation
- Immediate load capacity
- No cure time needed
**Concrete Foundation**:
- Excavation and forming
- Pour and cure (7+ days)
- Weather dependent
- Higher precision required
**Foundation Inspection**: Required before cabin delivery
### Site Prep Checklist
**Before Ordering Cabin**:
- [ ] Site assessment completed
- [ ] Access route confirmed
- [ ] Permits identified
- [ ] Foundation type selected
- [ ] Utility plan developed
- [ ] Budget confirmed
**Before Cabin Delivery**:
- [ ] Area cleared and graded
- [ ] Foundation installed and inspected
- [ ] Utilities stubbed to foundation
- [ ] Access route prepared
- [ ] Delivery date confirmed
- [ ] Site supervision arranged
### Cost Ranges for BC Site Prep
| Work Item | Low | High |
|-----------|-----|------|
| Clearing (per acre) | $2,000 | $10,000 |
| Grading (pad) | $2,000 | $8,000 |
| Access improvements | $1,000 | $15,000 |
| Foundation | $6,000 | $25,000 |
| Electrical service | $2,000 | $10,000 |
| Water connection | $2,000 | $15,000 |
| Septic system | $10,000 | $25,000 |
| **Total Range** | **$25,000** | **$108,000** |
*Actual costs depend on site conditions, location, and requirements*
### Avanta Homes Site Services
We offer complete site preparation packages:
- Site assessment and planning
- Permit applications and coordination
- Clearing and grading
- Foundation installation
- Utility preparation
- Turnkey delivery-ready sites
Contact us for a site evaluation and preparation quote.